logo
Home > products >
Cooling Tower Parts
>
BAC PVC Cooling Tower Fills For Various Industries

BAC PVC Cooling Tower Fills For Various Industries

Product Details:
Place of Origin: Jiangsu, China
Brand Name: Xcell Energy
Certification: SGS
Model Number: XL-1330mm-BAC
Detail Information
Place of Origin:
Jiangsu, China
Brand Name:
Xcell Energy
Certification:
SGS
Model Number:
XL-1330mm-BAC
Condition:
New
Cooling Type:
BAC Cooling Tower Parts / EVAPCO Cooling Tower Parts
Material:
PVC,CPVC
Warranty:
1 Year
Name:
EAC Pvc Fill Pack For Cooling Tower PVC Cooling Tower Fill As Industrial Equipment
Width:
1330mm
Usage:
Cooing Tower
Thickness:
0.38-0.6mm
Sheet Spacing:
20mm
Length:
2440mm/customized
Highlight:

High Light

Highlight:

PVC Cooling Tower Fills

,

BAC Cooling Tower Fills

,

BAC Cooling Tower Fill

Trading Information
Minimum Order Quantity:
1 Set
Price:
Negotiated
Packaging Details:
Regular packaging/customizable
Delivery Time:
7 Days
Payment Terms:
T/T
Supply Ability:
1000m2/per pay
Product Description

BAC Cooling Tower Fill PVC Cooling Tower Fills
1. Core materials and performance

Advantages of CPVC materials
BAC fillers are mainly made of chlorinated polyvinyl chloride (CPVC), which has a temperature resistance of up to 70°C (long-term working temperature of 93°C)1, which is significantly better than traditional materials such as PVC and PP. CPVC has flame retardancy (oxygen index ≥40), corrosion resistance (acid and alkali resistance, high molecular hydrocarbons) and UV aging resistance.

 
Structural design optimization
The ridge, groove and separator design is used to optimize the air flow path, reduce resistance and improve heat exchange efficiency. For example, the patented technology improves the heat dissipation performance of the secondary air flow channel through the separator.

 
2. Application scenarios and specifications
 
Applicable cooling tower types
Counterflow cooling tower: filler width 1330mm, customizable length, suitable for industrial-grade cooling needs.
Crossflow cooling tower: such as BAC FXT, FXV and other series, support PVC (normal temperature) or CPVC (high temperature) materials.

 
Technical parameters
Large contact area, excellent thermal performance, low resistance design reduces energy consumption.
Strong pressure resistance, long service life, customizable size to fit different towers.

 
Specifications:

 
Tech Date 
Sheet Width(mm)1330mm
Sheet Length2440mm/customized
Thickness0.38-0.6mm/customized
Sheet Spacing20mm
Colorgrey/black

 
 
BAC PVC Cooling Tower Fills For Various Industries 0
 

 

Related Cooling Tower Film Fill

 

EAC International Cooling Tower Fill Pvc Fills For Cooling Tower Industrial Equipment 8

• Outstanding thermal performance, will meet or exceed the performance of any OEM fill
• Unique method for quick and easy field installation, saves labor
• Nested shipment requires smallest fill staging area and low shipping costs
• Model-specific kits contain everything needed for an efficient installation, including detailed instructions, supports, hardware, and fill
• 2-week standard lead time

PACKING AND DELIVERY

 

Induced Draft Cooling Tower Fill Material Cooling Tower Fill Pack Counter Flow 610mm 6

 

Induced Draft Cooling Tower Fill Material Cooling Tower Fill Pack Counter Flow 610mm 7

 

Induced Draft Cooling Tower Fill Material Cooling Tower Fill Pack Counter Flow 610mm 8

 

Induced Draft Cooling Tower Fill Material Cooling Tower Fill Pack Counter Flow 610mm 9

 

Induced Draft Cooling Tower Fill Material Cooling Tower Fill Pack Counter Flow 610mm 10

 

 

FAQ

 

Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.


Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.