logo
Home > products >
Cooling Tower Parts
>
Black Tower Fill Packing Cooling Tower PVC Fills CPVC PP Cooling Tower Fills

Black Tower Fill Packing Cooling Tower PVC Fills CPVC PP Cooling Tower Fills

Product Details:
Place of Origin: Jiangsu, China
Brand Name: Xcell Energy
Certification: SGS
Model Number: XL-810-MA
Detail Information
Place of Origin:
Jiangsu, China
Brand Name:
Xcell Energy
Certification:
SGS
Model Number:
XL-810-MA
Condition:
New
Cooling Type:
BAC Cooling Tower Parts / EVAPCO Cooling Tower Parts
Usage:
Cooing Tower
Material:
PVC,PP,CPVC
Width:
810mm
Wave Height:
19-20mm
Thickness:
0.32-0.6mm
Length:
810*3660mm
Highlight:

High Light

Highlight:

Black Fill Packing Cooling Tower

,

CPVC PP Cooling Tower Fills

,

Black PP Cooling Tower Fills

Trading Information
Minimum Order Quantity:
1 Set
Price:
Negotiated
Packaging Details:
Regular packaging/customizable
Delivery Time:
7 Days
Payment Terms:
T/T
Supply Ability:
1000m2/per pay
Product Description

Black Cooling Tower Fill Packing Sheet Cooling Tower PVC Filler
 

Description:

 
* The material used for the Marley cooling tower filler is PVC/PP/ CPVC. The purpose of the filler is to increase the viscosity of the product, especially the small filler to increase the viscosity significantly. Marley cooling tower fill before accumulation is subject to dehydration sale to avoid consuming some of the isocyanate. It must be noted that the changeable carbon anhydride will cause the resin to foam, which will deter the physical properties of the polyurethane resin.
 
* In order to speed up the wetting speed of Marley cooling tower fill and reduce system viscosity. Still more and more fillers are increasing in the polyurethane resin, sometimes it is necessary to add a wetting and wetting dispersant in the resin in advance. In-mold paint is an additive with three benefits of coating, colorant and release agent.
 
* The Marley cooling tower filler is evenly burst into the mold, and after the paint film is dried, the polyurethane sole, self-skin foam, and polyurethane soft foam can be molded. necessary products. If the envoy wants to say that the quality of the filling habits is determined, it still depends on the following aspects:
 
① Marley cooling tower packing has a larger specific surface area (m2/m3 packing layer);
 
② Marley cooling tower filler liquid has better mechanical properties of uniform distribution on the surface of the filler;
 
③ The packing airflow of Marley cooling tower can be evenly distributed in the packing layer;
 
④ Marley cooling tower packing material is not without large porosity (m3/m3 packing layer). There are other caves, and factors such as its doctrinal strength, origin, artificiality and price should also be considered when choosing fillers carefully.


Specifications:
 
Tech Date  
Sheet Width(mm) 810mm
Sheet Length 810*3660mm/customized
Thickness 0.32-0.6mm/customized
Sheet Spacing 19-20mm
Color grey/white/black
Material PP/PVC/CPVC

Black Cooling Tower Infill Cooling Tower Package PVC Filler 810mm 1

Black Cooling Tower Infill Cooling Tower Package PVC Filler 810mm 2

 

Black Cooling Tower Infill Cooling Tower Package PVC Filler 810mm 3

 
Black Cooling Tower Infill Cooling Tower Package PVC Filler 810mm 4
 
Black Cooling Tower Infill Cooling Tower Package PVC Filler 810mm 5
 
Related Cooling Tower Film Fill
PP PVC International Cooling Tower Fill Replacement Cross Flow 20mm 4

PACKING AND DELIVERY

PP PVC International Cooling Tower Fill Replacement Cross Flow 20mm 5
 
PP PVC International Cooling Tower Fill Replacement Cross Flow 20mm 6
 
PP PVC International Cooling Tower Fill Replacement Cross Flow 20mm 7

 

FAQ

 

Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.


Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.